Road closure and detour information

WIS 59/89: US 12 to Rock County Line

Walworth County

The Wisconsin Department of Transportation (WisDOT) is scheduled to begin resurfacing work along WIS 59 in April, between US 12 and the

Rock/Walworth County line. The project is scheduled to be completed by mid-summer

Overview

The WIS 59/89 project will improve approximately

2.6 miles of roadway. Improvements include:

  • Resurface WIS 59 within project limits, and a portion of WIS 89
  • Updated traffic signals, curb ramps, guardrail, pavement markings, and signing.

Traffic Impacts and Detours

  • WIS 59 will be closed to through traffic, from US 12 to the Rock County Line, during construction beginning April Ito the end of May.
  • A detour will be posted utilizing US 12, CT H N and WIS 26.
  • Local traffic will be maintained for businesses and other destinations within the work zone.

 

All work is weather dependent. The project team thanks you for your patience and cooperation throughout this project!